US EPA – VGP one-time report electronic system now available
- Published:
- 14 October 2011 12:55
- Updated:
- 06 December 2012 11:31
The Environmental Protection Agency (EPA) has advised that the subject electronic reporting system is now available. For each vessel covered by the Vessel General Permit (VGP) programme, the owner/operator is required to submit a one-time report between 30 and 36 months after obtaining a permit for discharges incidental to the normal operation of the vessel.
For vessels that obtained coverage on or before 19 September 2009, the one-time report is due by 6 February 2012. For further information, please visit the EPA website.
Source: ABS Regulatory Affairs
Contact: Tim Wilkins